Decision Assurance Infrastructure
Summit Cognitive
§ Solutions — Federal & Defense

No Decision Receipt → No Decision.

The Department is deploying AI into decisions that commanders, contracting officers, and Inspectors General must eventually defend. Summit is the evidence layer that makes those decisions defensible — built by a HUBZone small business, designed for air-gapped environments, mapped to the controls you already report against.

§ 01

The oversight moment is the design requirement

When the IG asks 'why did the system recommend this?', three answers exist: reconstruct from logs (weeks, contested), concede the system can't say (career-limiting), or produce the receipt (minutes, signed, replayable). We build for the third answer.

20
NIST 800-53 control statements
4
deny-by-default policy domains
ATO
evidence bundle: SSP + POA&M
Air-gap
deterministic replay offline
§ 02

Mission surfaces

Mission 1

AI-Assisted Intelligence Analysis

Graph intelligence with provenance attached: live-feed ingestion, ATT&CK technique mapping, TAXII/STIX 2.1 interoperability with existing IC tooling — every analytic judgment receipted.
Mission 2

Governed Autonomous Agents

Agent fleets operating under default-deny policy: gated tools, role isolation, memory trust states, and full deterministic replay for after-action review.
Mission 3

Verified Multi-Agent Coordination

Formal verification of agent coordination before fielding — model-checked deadlock freedom and behavioral contracts, with machine-checkable certificates for the safety case.
§ 03

Compliance posture

Mappings are published and versioned — your assessors can read them before your first call with us.

§ 04

Doing business with Summit

Entity
Summit Cognitive, Inc. — Delaware C-Corp
Status
HUBZone small business
UEI
W2DJC8PEM3X6
CAGE
20AM0
Vehicles
BAA responses active; direct pilot SOWs $25K–$75K
Contact
brian@summitcognitive.ai

The 10-Day Decision Assurance Pilot is deliberately scoped below simplified acquisition thresholds and structured as a study with deliverables — designed not to entangle procurement while producing artifacts your program can act on.

Bring us the workflow the IG will ask about.

We'll scope a pilot against it, in writing, within two business days — including the compliance mappings your assessors will want to see.